LEED Construction Waste Management

August 21, 2016


File Name

This pilot credit is closed to new registrations

To reduce construction and demolition waste disposed of in landfills and incineration facilities by recovering, reusing, and recycling materials.

Requirements

* This credit language is drawn from the LEED v4 draft. Where other point totals are noted, this pilot credit is worth 1 point in total. *

Recycle and/or salvage nonhazardous construction and demolition materials. Calculations can be by weight or volume but must be consistent throughout.

Exclude excavated soil, land-clearing debris, and alternative daily cover (ADC). Include wood waste converted to fuel (bio-fuel) in the calculations; other types of waste-to-energy are not considered diversion for this credit.

However, for projects that cannot meet credit requirements using reuse and recycling methods, waste-to-energy systems may be considered waste diversion if the European Commission Waste Framework Directive 2008/98/EC and Waste Incineration Directive 2000/76/EC are followed and Waste to Energy facilities meet applicable European Committee for Standardization (CEN) EN 303 standards.

Option 1. diversion (1-2 points)
Path 1. divert 50% and three material streams (1 point)

Divert at least 50% of the total construction and demolition material; diverted materials must include at least three material streams.

OR

Path 2. divert 75% and four material streams (2 points)

Divert at least 75% of the total construction and demolition material; diverted materials must include at least four material streams.

Option 2. reduction of total waste material (2 points)

Do not generate more than 2.5 pounds of construction waste per square foot (12.2 kilograms of waste per square meter) of the building's floor area.

Credit specific
Required Documentation BD&C Option 1 Option 2
List of construction waste generated and diverted to landfill itemizing the waste, the material stream, waste total amount, and diverted amount per item and total for project. All units of measure must be consistent
Evidence of average recycling rates for Commingled waste sorting Facilities (if applicable)
Explanation why Waste-to-Energy Must be Used (if applicable)
Proof of Certification for Waste-to-Energy Facilities (if applicable)
Waste per Area for entire project
Source: www.usgbc.org
RELATED VIDEO
Waste Solutions Inc. - Construction & Demolition Waste
Waste Solutions Inc. - Construction & Demolition Waste ...
Premier: Efficient and Integrated Waste Management with
Premier: Efficient and Integrated Waste Management with ...
Course preview: Construction Waste Management in LEED
Course preview: Construction Waste Management in LEED